Celebrating 170 Years of Crane
This July 4th 2025 marks 170 years since R.T. Crane famously opened his one-man foundry in the United States.
The Thurso Pipeline Valve Replacement Project involved upgrading 11.7km of water pipe from Latheron to Lybster in the Scottish Highlands.
A cast iron water main supplying approximately 450 properties required 5 very old valves to be switched out.
The traditional approach would be to shut off the mains for each valve replacement causing water supply to stop multiple times. Instead, Scottish Water selected the WASK AquaStop bypass solution to ensure continued water supply to customers and reduce the overall installation time on site, minimising disruption, and cost.
Please watch the video below to find out more about the project and hear from Scottish Water and MAL Civils about the real-world benefits of the WASK AquaStop.